Tag Archives: improved roads

Hoardings/Flags “Menace” in Thiruvananthapuram City !

The ongoing district convention of the Students Federation India (SFI) has resurrected the menace of hoardings, flags and festoons on city roads. The major stretches in the city now carry a number of flags, festoons etc which are posing difficulties … Continue reading

Posted in News, Roads | Tagged , , , , , | Leave a comment

4 Laning of Kazhakkoottam-Kesavadasapuram Road: Alignment Survey to Start from June 18

The alignment survey for the four-laning of the Kazhakkoottam -Kesavadasapuram stretch at 30 m-width will begin from June 18. The decision was taken at a high-level meeting convened by the Chief Minister the other day to discuss the monorail project … Continue reading

Posted in Infrastructure, Projects, Roads | Tagged , , , , , , , , , , , , , , | 1 Comment

A Ride from Chacka to Shanghumugham Beach

A ride from Chacka to Shanghumugham Beach. This road was developed under Thiruvananthapuram City Roads Improvement Project (TCRIP) by Thiruvananthapuram Road Development Company Limited (TRDCL). From Shanghumugham Jn to Beach, near the South Palace, the road takes a new alignment … Continue reading

Posted in Infrastructure, Roads | Tagged , , , , , , , , , , , , , , , , , | Leave a comment

A Ride Through Thiruvananthapuram Bypass: Part Two

In this part, the journey in a two wheeler from Attakulangara and going via Subhash Nagar to join at Eanchakkal and proceeds along the Bypass. To be Continued…..  

Posted in Construction, Infrastructure, Roads, Transport | Tagged , , , , , , , , , , , , , | 4 Comments

Govt.Approved the Revised Alignment for Karamana-Vazhimukku Road Widening

Government has approved the revised alignment for the four laning of Karamana – Vazhimukku¬†stretch of National Highway-47. As per the new alignment, one way¬†traffic will be implemented at Pravachambalam. At Mudavoorpara, the land will be acquired equally on both sides … Continue reading

Posted in Infrastructure, Roads | Tagged , , , , , , , , , , , , , , | Leave a comment

CRIP’s Second Phase to be Commissioned Today

The second phase of the City Road Improvement Project (CRIP), covering 9.5 km, will be commissioned on Wednesday by Chief Minister Oommen Chandy. The 2-km Kowdiar – Peroorkada stretch; 2.75-km RR Lamp – Statue – Overbridge – Pazhavangadi stretch; 1.46-km … Continue reading

Posted in Infrastructure, Roads | Tagged , , , , , , , , , , , , , , , , , , | 2 Comments

Thakaraparambu Flyover Work Started

“Finally !” the work for the flyover at Thakaraparambu has started on Monday after a long wait of nearly 7 years ! This is the second flyover under the Thiruvananthapuram City Road Improvement Project (TCRIP), after the one at Bakery … Continue reading

Posted in Infrastructure, Roads | Tagged , , , , , , , , , , , , , , , , , , , , , | Leave a comment