Trivandrum Monorail : Track Survey Commenced

Key points:

  • Trivandrum Monorail Phase I from Technopark hub locality of Kazhakuttam in North to Balaramapuram in South
  • Road Traffic pattern and volume over 15 minute intervals is being surveyed by NATPAC to assess the frequency of monorail being done over two weeks.
  • Alignment is via Kazhakoottam, Medical College, Thampanoor and Balaramapuram
  • Monorail at 50cr/km is considered more cost effective than Metro Rail at 200 cr/km.  Metro rail costs f0ur times more and is suited for Tier 1 metros

News Sourced from Metro Vaartha dated 27.09.2011

Advertisements
This entry was posted in Infrastructure, Mass Transit, Miscellaneous, News, Projects, Transport and tagged , , , , , , , , , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s